Are you ready to test?

Use our tips to make sure your site is ready for testing
Be test ready:
  1. 240v power required
  2. Know DAP
  3. Past second fix stage
  4. Turn any air conditioning/handling off


Mastic / foam as appropriate:
  • Bathroom
  • Pipes / soil stacks / service risers
  • Sanitaryware

Kitchen:
  • Pipes / penetrations under sink
  • Cavity sealed behind units
  • Extractors

All other areas:
  • Skirtings
  • Doors and windows
  • Access panels and loft hatches